[vc_row full_width=”stretch_row” css=”.vc_custom_1574228156463{padding-top: 10px !important;background-image: url(https://www.leewardconstruction.com/wp-content/uploads/2019/11/projectbg-3.gif?id=2241) !important;}” el_id=”solutiontitle”][vc_column width=”2/3″][vc_column_text css=”.vc_custom_1581687303850{margin-bottom: 100px !important;}”]

Wilkes-Barre Wyoming Valley Airport

[/vc_column_text][vc_row_inner css=”.vc_custom_1574227223547{margin-bottom: 30px !important;}” el_id=”solutions”][vc_column_inner width=”1/2″][vc_column_text css=”.vc_custom_1588022611314{border-top-width: 1px !important;padding-top: 15px !important;border-top-color: rgba(255,255,255,0.58) !important;border-top-style: solid !important;}”]SOLUTION

Full Depth Reclamation of Asphalt Runway 7/25[/vc_column_text][vc_column_text css=”.vc_custom_1588022647423{border-top-width: 1px !important;padding-top: 15px !important;border-top-color: rgba(255,255,255,0.58) !important;border-top-style: solid !important;}”]MARKET

Airport[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text css=”.vc_custom_1588022655979{border-top-width: 1px !important;padding-top: 15px !important;border-top-color: rgba(255,255,255,0.58) !important;border-top-style: solid !important;}”]TECHNIQUE

Reclamation, Paving[/vc_column_text][vc_column_text css=”.vc_custom_1588022670421{border-top-width: 1px !important;padding-top: 15px !important;border-top-color: rgba(255,255,255,0.58) !important;border-top-style: solid !important;}”]LOCATION

Wyoming, PA[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row gap=”30″ css=”.vc_custom_1574228534283{margin-top: 30px !important;}”][vc_column width=”2/3″ css=”.vc_custom_1574228513694{padding-top: 0px !important;}”][vc_images_carousel images=”2451,2452,2453,2454″ img_size=”full” onclick=”link_no” autoplay=”yes” wrap=”yes” css=”.vc_custom_1590720400239{margin-top: 0px !important;}”][vc_column_text]

The 1.5 Million Runway 7/25 Rehabilitation Project consists of full reconstruction of the Runway at the WilkesBarre/Wyoming Valley Airport.

The 30,000 square yards of existing bituminous concrete pavement was reclaimed in place into a one inch minus material.  51,000 gallons of emulsion was added to stabilize the new subbase.  Precision grading was performed on the subbase with an automated GPS grader.  Once the grades were verified and the weather was right, 4,300 tons of HMA Base Asphalt and 2,900 tons of HMA Wearing Asphalt were placed with precision automatic grade controlled paver. Full depth saw cuts were made every seventy-five linear feet and sealed with rubberized joint sealant.  At the project’s completion, new pavement markings were installed on the runway making it officially open for air traffic.[/vc_column_text][/vc_column][vc_column width=”1/3″ css=”.vc_custom_1574228412594{background-color: #f4f4f4 !important;}”]

Request a Bid

  • Drop files here or
    Accepted file types: jpg, png, txt, doc, pdf, Max. file size: 64 MB, Max. files: 5.
      Formats: jpg, png, txt, doc, pdf
    [/vc_column][/vc_row]