TDC Logistics Center
Jessup, PA $13.4 MM -860,000 CY Excavation and Controlled Fill for new -750,000 SF Tilt Up Building -600,000 CY Blasting -Wetland Mitigation (2 Acres) -Mine Mitigation -On Site Crushing -Signalized…
Jessup, PA $13.4 MM -860,000 CY Excavation and Controlled Fill for new -750,000 SF Tilt Up Building -600,000 CY Blasting -Wetland Mitigation (2 Acres) -Mine Mitigation -On Site Crushing -Signalized…
Humboldt Lot#9- Niagara Bottling Water Hazel Township, PA $24.3 MM -1,180,000 Excavation and Controlled Fill for new -1,200,000 SF Pre-Cast Building -825,000 CY Rock Blasting -Accelerated construction schedule, on site…