Emergency Flood Work Repairs

-Four PennDOT projects with accelerated completions -Mobilized Eight crews within two days -Value engineered savings of $267k -Completed on time

Water Storage Site Work

-Design Build Concrete Tank Foundation -700 LF of new 12” Ductile Iron Water Main -Grading & Access Road with Perimeter Fence

Utility Site Work and Foundation

-Mass Excavation and Storm Facilities – Accelerated winter project schedule -Foundation for future buildout -Completed ahead of schedule

Combine Storage Outfall Tank

-1.7 Million Gallon Combined Sewer Overflow Tank -2,700 CYs Specialty Concrete -Reinforced Steel and Post Tensioned Cables -Mass Excavation and Soil Nails, TESS -Congested Work Site

Interstate 84 Reconstruction

-Four new Bridge Structures on I-84 -370,000 SY Full Depth Pavement Replacement -45,000 TONs of Stone Matrix Asphalt from Leeward Asphalt -800,000 CYs Excavation -Upgrade Exit Ramps and Type A, B, C, E & F signs -Highway Lighting (Temporary and Permanent)

TDC Logistics Center

Jessup, PA $13.4 MM -860,000 CY Excavation and Controlled Fill for new -750,000 SF Tilt Up Building -600,000 CY Blasting -Wetland Mitigation (2 Acres) -Mine Mitigation -On Site Crushing -Signalized Intersection Construction (HOP)

Niagara Bottling Water

Humboldt Lot#9- Niagara Bottling Water Hazel Township, PA $24.3 MM -1,180,000 Excavation and Controlled Fill for new -1,200,000 SF Pre-Cast Building -825,000 CY Rock Blasting -Accelerated construction schedule, on site crushing -DDC (General and Deep Mine) -7,500 LF off Site 20” Water Line (HCA) -Signalized Intersection Construction (HOP)

AVP Airport Taxiway B Extension

Wilkes-Barre/Scranton International Airport Taxiway B Extension $9.0 MM -965,000 CY Rock Excavation and Controlled Fill for new Taxiway B and Glide Slope Antennae -4,500 LF 60” dia. Underground Storage System -Airfield Inlets, Lighting, Painting -Active International Airport

WBW Airport Runway 7/25 Rehabilitation

Wilkes-Barre/Wyoming Valley Airport Runway 7/25 Rehabilitation $1.3 MM -Full Depth Reclamation of 30,000 SY existing asphalt with 51,000 gallons Emulsion Additive -Grading of pulverized asphalt with GPS Grader -6,800 tons Specialty FAA Asphalt Mix installed with GPS